Building Demolition in Weymouth, MA

Building Demolition · Weymouth, MA

Commercial buildings knocked down and the site cleared

Building demolition takes a whole structure down and clears the debris from the site. We knock down commercial and industrial buildings, warehouses, garages and apartment buildings. Additions and outbuildings can come down on their own. MJ Masonry is a demolition contractor serving the South Shore, and whole-building knockdowns are the focus of our demolition work.

Property owners and developers around Greater Boston hire us for building demolition, and so do general contractors. We look at the building and the site first, then put the quote in writing. One house on its own lot falls under single-family house demolition.

What We Handle

  • Full knockdowns of commercial and industrial buildings
  • Warehouses and commercial garages taken down
  • Apartment buildings and three-deckers knocked down
  • Additions and outbuildings removed while the main building stays
  • Our own heavy equipment for the machine work
  • Debris hauled off and the site left clear
  • Building demolition for developers and general contractors
  • A written quote that spells out where our work ends

Request a Building Demolition Quote

Tell us about the demolition or masonry work and where it is. We look at the job and put the quote in writing.

What does a commercial demolition job include?

A commercial demolition job takes the whole building down with our heavy equipment. On a steel-frame building, federal OSHA rules have the steel cut loose before a wall gets pulled over. The debris gets loaded onto trucks and hauled off the site. The written quote says where the job ends and what happens to the slab and foundation.

Some jobs take down only part of a property. An addition or an outbuilding can come down while the main building stays. The State Building Code has the permit's site plan show what comes down and what stays.

Some of the work around a knockdown belongs to other trades. An asbestos abatement contractor removes any asbestos before demolition starts. Other hazardous materials also come out first, through a separate contractor. If the building stays standing and only the inside goes, that is an interior gut-out.

Before the machines start on a commercial building

OSHA's demolition rules call for an engineering survey before work starts. A competent person checks the structure for any chance of an unplanned collapse. Nearby structures where workers could be exposed get checked too. The rule calls for written proof that the survey was done.

Every gas, electric, water and sewer line gets shut off or capped outside the building line. Each utility company hears about it in advance. In an industrial building, pipes and tanks get checked for chemicals or fuel. Anything found gets tested and purged before demolition starts.

MassDEP, the state's environmental agency, wants written notice 10 working days before demolition starts. Only residential buildings with fewer than 20 units skip that notice. The same rules make the job answer for its dust, and wetting the area is one fix they name.

Building demolition permits in Boston and Quincy

Every city and town issues its own demolition permit, and the paperwork differs from place to place. The State Building Code holds the work until the plans and a demolition schedule are approved.

In Boston, the Inspectional Services Department wants shut-off notices from every utility. It also asks for a Dig Safe reference number and MassDEP approval for hazardous materials. Under Article 85, buildings at least 50 years old go to the Boston Landmarks Commission first. So does every building Downtown or in Harborpark.

In Quincy, every demolition needs at least one Health Department walk-through. For the health sign-off, the building has to be clear of asbestos, PCBs, mercury and fuel oil. The city also asks for water or a misting agent on site before the work starts. Our guide to demolition permits in Massachusetts covers the steps in more towns.

Excavator breaking down a two story brick building while a worker hoses down the dust, building demolition Excavator beside a rubble pile on a cleared lot next to a brick apartment building, building demolition

Ready to get started?

Call or text for a written quote. We work about 90 miles around Weymouth across Massachusetts.

(617) 838-0280
How We Work

How a Job With MJ Masonry Runs

From the first call or text to the finished work, here is how it goes.

1

Call or Text

Call or text (617) 838-0280 and tell us what the job is and where. Photos help, and so do plans on commercial work.

2

We Look at the Job

We come out and look at the job. On bid work, we go through the plans and specs instead.

3

Your Written Quote

The price comes in writing, with the scope spelled out. Once you say yes, we set a start date with you.

4

Before the Work Starts

A teardown waits on the permit and any asbestos removal. The utilities shut off their service before our machines arrive. On a commercial job, we work to the general contractor's schedule.

5

The Finished Work

Our machines take the building down, and we load out the debris as we go. On masonry jobs, the walls go up to the plans, and we go over the finished work with you.

FAQ

Building Demolition Questions, Answered

Common questions about building demolition around Weymouth and the towns of the South Shore and Greater Boston. If yours is not here, call or text and ask.

Call (617) 838-0280

How much does commercial demolition cost?
Most of the price comes from the building itself: its size and what it is made of. Height and access matter too, because a building tight to a sidewalk or another building needs more care. The debris load and the slab and foundation count as well. We look at the building, then put the quote in writing.
Do you do commercial demolition for general contractors?
Yes. We take on building demolition for general contractors and developers, as well as property owners. The written quote lists what we take down and what we leave. Our masonry side can also take on the commercial masonry on the new building.
How long before a commercial building can come down?
MassDEP's notice needs 10 working days, and any asbestos abatement finishes before we start. In Boston, Landmarks Commission staff answer an Article 85 filing within 10 calendar days of a complete application. A building found significant gets a public hearing within 30 days. After the hearing closes, the permit can wait 90 more days.
Do you take down apartment buildings and three-deckers?
Yes. Multi-unit buildings fall under building demolition, and single-family homes fall under house demolition. An apartment building with 20 or more units needs the MassDEP notice. A three-decker skips that notice, but the asbestos survey rule still applies.
How far do you travel for building demolition?
Weymouth sits at the center of our service area. For building demolition, we go about 90 miles out. That reaches Boston and the South Shore, along with Worcester, Lowell, Fall River and New Bedford. Call or text (617) 838-0280 with the building's address.
More From MJ Masonry

Work That Pairs With Building Demolition

Excavator tearing into a two story wood frame house while a worker sprays water on the dust, house demolition

House Demolition

We take whole houses down to the ground across Weymouth and the South Shore. Garages and barns come down too, and we clear the debris off the site.

Learn More
House interior gutted to the wall studs and roof rafters with debris on the floor, interior demolition

Interior Demolition

Interior demolition for houses and commercial spaces around Weymouth and Greater Boston. We handle gut-outs and selective demolition ahead of a renovation and carry the debris out.

Learn More
Concrete block stair and elevator tower rising on a new commercial building, commercial masonry

Commercial Masonry

We lay concrete block (CMU) buildings and the elevator and stair shafts inside them. Brick and brick veneer go up on the same commercial jobs, priced in writing from the plans.

Learn More
Why Choose MJ Masonry

Demolition and Masonry Around Weymouth

The Teardown and the New Masonry

One company can handle the teardown and the masonry that follows. We can clear an old building off a lot, then lay the block and brick for the new one.

Our Own Demolition Equipment

Our own machines do the knockdowns, on a detached garage or a full commercial building. Clearing the site afterward is part of the same job.

The Foundation Stays or Goes

On a teardown, you decide what happens to the foundation. When it comes out, we break it up and fill the hole.

Priced After We See the Job

We look at the site, or the plans on bid work, before we price anything. Then the quote comes to you in writing.

Guides and Resources

Building Demolition Guides

Request a Quote

Get In Touch With MJ Masonry

Use the form to tell us about the work and the town it is in. You can also call or text (617) 838-0280 and send photos or plans.

  • Call or text (617) 838-0280
  • Serving Weymouth, MA, the South Shore and Greater Boston
  • Written quotes · demolition, brick, block and concrete work

Request a Quote

Tell us about the demolition or masonry work and where it is. We look at the job and put the quote in writing.

Call (617) 838-0280